Route Downloads

The route can be installed and used in either of the following configurations. The first is for MSTS, and will install into the standard MSTS folder structure. The other is a "stand-alone" Open Rails installation and can be set up to run independently of MSTS. Please read the relevant readme or installation instructions.

NSW_Tumulla_Bank+Plus-V2 Tumulla Bank Plus Route - v2.0: This covers the NSWGR railway line from Wallerawang to Orange - by Brian Bere-Streeter and Chris Nelson. 126.6 MB 3245x
NSW_Tumulla_Bank+Plus-V2 Joppa Junction Route Plus - v1.0: This starts just south of Goulburn, ends just north of Harden. It also includes the branch from Yass Junction to Yass Town, and the branch from Galong to Boorowa. - by Brian Bere-Streeter. 147.3 MB 2400x